You have arrived on the English website.

MARINI launches its new MASTER TOWER during bauma Munich

Discover the latest MARINI innovation: the MASTER TOWER
master tower - scale model
Master Tower scale model 1:5

THE NEW MASTER TOWER BY MARINI: THE SOLUTION FOR USE OF RECYCLED MATERIALS, LOW EMISSIONS AND LOW ENERGY CONSUMPTIONS.

MARINI has launched the Master Tower at Bauma.
A new, innovative technology designed with a clear target: to think further, to give solutions, to respect the enviroment, to provide our customers a real return on investment.
The new MARINI MASTER TOWER represents a new milestone in hot and warm mix asphalt production in terms of use of recycled materials, low emissions and low energy consumptions.

Marini’s new Master Tower asphalt plant

BENEFITS

100 %
Up to 100% of RAP delivered at 160°C

THE USAGE OF RAP

Marini looks ahead with its new generation MASTER TOWER asphalt plant that can use up to 100% of RAP.

You may be interested in

  • Marini XPRESS lands on the Costa Smeralda in Sardinia

    The XPRESS 2500 batch plant has flanked the other plants in the area to meet the...
  • Marini goes to Imbaù, Brazil, to play pivotal role in building next generation roads.

    The Best Batch 1500 - a Marini premium quality asphalt plant suitable for urban...
  • When it comes to Racetrack Engineering, Asphaltech is at its BEST!

    In early 2019, Asphaltech (Australia) was the successful bidder to resurface the...